Installation Overview At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the timely execution of the project. Designed to reinforce ESG targets, the installation boosts process efficiency while lowering overall power consumption and CO₂ levels. https://listingbookmarks.com/story20759753/energy-efficient-400-kw-chiller-installation-secures-50k-yearly-energy-savings-and-200-tonnes-co%E2%82%82-cut