Among the list of prime difficulties confronted by the corporate was the additional waiting around time for vans that was fully a waste of time. The most important purpose behind this problem was the absence of a proper schedule to the trucks as mentioned within the case that the trucks https://hbr-case-study-help73436.blogrenanda.com/42937837/getting-my-hbs-case-study-analysis-to-work